X51 Installed in New Home

X51 arrived at the Scottish Submarine Centre on timeimg_5131Ā and was swiftly removed from the trailers. The Verslifts set to work to slip her into the building, main body first and engine room second, leaving her lined up for assembly. This was the tricky part as the tolerances are quite fine, even though she is quite agricultural! Lots of tensioning straps were used to get the perfect line and the job of inserting 120 stainless steel bolts could begin.

img_0564

Leave a Reply